×
November 16, 2026
Muskette
3 min Read

Musk Outlines Enlarged Starship Version 4 Stretching 70 Meters Tall and Powered by Nine Raptor Engines

Listen on the go

Voicing this story…

Elon Musk did not wait long after SpaceX's first orbital Starship catch to sketch the next leap. On Sunday evening into Monday he posted concrete dimensions for Starship V4, the upper stage that will follow the V3 hardware that just flew.

The ship will stretch to roughly 70 meters. That is about a 40 percent length increase over the current V3 design that stands near 52 meters. The extra volume lets it carry more than 60 percent additional propellant.

Engine count rises from six to nine. Three more Raptor-Vacuum engines join the mix, and all of them will be higher-thrust V4 versions. The sea-level engines stay at three for landing and boost-back duties.

Payload and cost targets

SpaceX's IPO materials already pointed to V3 delivering around 100 metric tons to low Earth orbit when reusable. Future ships, potentially starting with V4, are aimed at 200 tons. Musk went further in a reply, saying once both stages return routinely the propellant bill per flight should fall below 500 thousand dollars while payload climbs past 200 tons.

Those numbers matter most for lunar work. Every crewed or cargo landing needs an orbital tanker farm topped up first. A NASA panel recently floated roughly 22 tanker flights. Musk has long argued the real number is closer to six to eight. A V4 tanker hauling more than 200 tons of propellant per trip brings the refill count down to five or six launches in his math.

Fewer tankers mean more landings per year and lower cost per ton on the surface. SpaceX already lists cargo flights starting no earlier than 2028 at 100 million dollars per metric ton, with a lander able to set down up to 100 tons.

Building on Flight 15

The V4 outline arrived one day after Ship 42 completed more than 22 hours and about 14 orbits, released 26 Starlink V3 satellites, and settled into the Starbase tower arms. Musk inspected the heat shield and engines the next day and said the vehicle looked good enough that it could probably fly again after a few weeks of work.

He was careful to separate the two ideas. Catching today's ship proves the recovery architecture. Stretching the next ship and adding vacuum engines is the capacity step that turns rapid reuse into real mass to orbit. Earlier comments from August 2025 already flagged a longer ship and a 2027 first flight for V4; the new post simply locks in the length, propellant fraction and engine layout.

For now the booster side of the stack stays at 33 Raptors. The full vehicle would therefore fly with 42 engines once V4 ships arrive. That combination is what Musk expects will finally make high-cadence, fully reusable heavy lift routine rather than experimental.

The conversation on X and across space desks immediately turned to how many fewer tanker flights a 200-ton-class tanker enables and whether the Moon city timeline Musk floated earlier this year gets pulled forward. The numbers are still paper, but they are now specific enough to model against Artemis schedules and commercial lunar contracts.

0 COMMENTS

LEAVE A GRITTY RESPONSE